SEVERE WX : Flood Warning View Alerts

Work Near U.S. 231/William Natcher Bridge May Impact Driving Thursday

Asphalt paving on the southbound lanes of the bridge may delay travel.

Posted: Nov 11, 2020 7:48 AM

A one-day operation leading up to a Ohio River bridge could delay travel Thursday.

Kentucky Transportation Cabinet announced that a contractor will work in Indiana on the southbound lanes of the William H. Natcher Bridge.

Asphalt paving work will start at 7 A.M. and will finish on the same day.

Flag operators will direct traffic in the area during the paving.  KYTC remind motorists to reduce their speed at the site and prepare for stop and go traffic.

Evansville
Clear
33° wxIcon
Hi: 54° Lo: 30°
Feels Like: 33°
Owensboro
Clear
36° wxIcon
Hi: 51° Lo: 30°
Feels Like: 36°
Princeton
Clear
32° wxIcon
Hi: 50° Lo: 29°
Feels Like: 32°
Madisonville
Clear
35° wxIcon
Hi: 54° Lo: 31°
Feels Like: 35°
Jasper
Clear
34° wxIcon
Hi: 51° Lo: 30°
Feels Like: 34°
A plunge of Arctic air could give parts of the Tri-State some snowflakes Monday
WEVV 4K Doppler Radar
WEVV 7-Day Forecast
WEVV Watches & Warnings

Latest Video

Image

Snow Possible as Cold Air Moves In (11/28/20)

Image

Scott Zoll Is This Week's Hometown Hero

Image

College MBB & WBB: USI splits with Rockhurst

Image

44Blitz: Second Round Kentucky HS Football

Image

11-27 Weather

Image

Tracking Arctic Air & Possible Snow (11/27/2020)

Image

Families Celebrating Thanksgiving Unconventionally with New Restrictions in Place

Image

StormTeam44Forecast (11/25/20)

Image

HS BB: South Spencer Tops Tecumseh On The Road

Image

Feast With Friends

Community Events